Planning essentials
Tap to expand
Planning essentials
Budget, layout, and selections drive boise cabinet project process guide timelines in Boise, Meridian, Eagle, Kuna, Star, Middleton, Nampa, and Caldwell, not a single sticker price.
Use the Boise Cabinet Cost Guide for ranges, the Treasure Valley guide for local context, and the cabinet process guide for milestones.
- Hold 5 to 10% contingency for field adjustments
- Lock layout before cabinet fabrication
- Match quotes with identical line, finish, and install scope
Cabinet design and installation milestones
Tap to expand
Cabinet design and installation milestones
Consultation → preliminary scope → design development → agreement → permits → construction → punch list → warranty walkthrough.
Permits and selections order
Tap to expand
Permits and selections order
Submit permits when layout is stable; order long-lead items after rough-in requirements are known.
Inspections and closeout
Tap to expand
Inspections and closeout
Failed rough inspections should be cleared before cover-up. Punch lists belong in writing before final payment.
What we measure and why
Tap to expand
What we measure and why
Field measurement records wall lengths at multiple heights, floor level across the run, ceiling height at each corner, window and door casings, plumbing and electrical locations, and existing soffits. Cabinets are dimensioned from this reality, not from builder prints that rarely match it.
Sequence the selections
Tap to expand
Sequence the selections
Choose in this order: door profile, finish family (matte, gloss, woodgrain), exact finish from physical samples in your home, hardware last. Sequencing prevents the showroom overwhelm of facing hundreds of finishes at once.
What to check on your shop drawings
Tap to expand
What to check on your shop drawings
- Cabinet widths against the measured plan, including fillers
- Drawer vs door configuration for every base cabinet
- Appliance openings against confirmed model specs
- Outlet, switch, and vent locations relative to backsplash runs
- Crown, light rail, and end-panel details at exposed sides
Installation week
Tap to expand
Installation week
Installation runs 2 to 5 days for most kitchens: protection down, bases set level against the measured datum, uppers hung, panels and fillers scribed, doors and drawers adjusted, hardware aligned. Out-of-level floors, normal in older Boise homes, are absorbed at the base so counters land flat.
What belongs on a cabinet punch list
Tap to expand
What belongs on a cabinet punch list
Door and drawer alignment, consistent reveals, hardware placement, soft-close operation on every hinge and slide, scribe and caulk lines at walls and ceilings (especially in older Boise homes), finish touch-ups, and interior accessory operation. Walk every cabinet, open everything, and look down sight lines where reveals show.
Explore our catalog
Tap to expand
Explore our catalog
Next steps
Tap to expand
Next steps
Boise Cabinet Co designs custom cabinets to your measurements, builds each order to your layout, and installs it with our own crew across Boise, Meridian, Eagle, Kuna, Star, Middleton, Nampa, and Caldwell, with a written scope from consultation through installation.
Request a quote · Schedule consultation · All guides.
Back to this guide anytime for the overview.
Explore local guides, cost planning, cabinet catalog, and get an estimate.