Before you call anyone
Tap to expand
Before you call anyone
- Photograph your current space and list what fails daily
- Measure rough room dimensions and ceiling height
- Set a planning range from the cost guide
- Collect 5 to 10 inspiration photos and note what they share
- Decide scope: one room or a multi-room program
During design
Tap to expand
During design
- Confirm appliance models, especially panel-ready units
- Choose drawers vs doors for every base cabinet deliberately
- View finish samples in your home lighting, morning and evening
- Verify trash, recycling, and small-appliance homes exist in the plan
- Check drawings against field measurements before sign-off
Before fabrication release
Tap to expand
Before fabrication release
- Written line-item scope signed
- Hardware selected and counted
- Counter material chosen (affects overhang support)
- Install dates and household logistics planned
- Contingency held: 5 to 10 percent, more for older Boise homes
Plan in this order
Tap to expand
Plan in this order
Scope, budget, selections, schedule. Decide which rooms are in scope, set a planning range per room from the cost guide, make door and finish selections early, then build the calendar around fabrication lead time.
Homeowners who reverse the order, picking install dates before selections exist, are the ones who end up disappointed by lead-time math.
Full guide and cost planning
Tap to expand
Full guide and cost planning
Explore the catalog
Tap to expand
Explore the catalog
Next steps
Tap to expand
Next steps
Estimator · Schedule consultation.
When you are ready to plan your own, see kitchen cabinets in Boise for layouts, door styles, and installation by our crew.
